top of page
.png)
Rolloff - Receivers



1/2
Standard Construction
-
3/16" Floor, length determined by capacity.
-
12 Gauge sides, front, door & roof.
-
Tapered construction for easier dumping.
-
3" x 5" x 3/16" structural tubing used for back channel and roof supports.
-
10 Gauge formed, 2 bends, 53/4" W side channels are spaced 30" on centre for side & roof stiffeners.
-
Industrial enamel primer & paint.

bottom of page